Prestige KIADB Data Centre Blocks

Featured Image of Prestige KIADB Data Centre Blocks


has three data centre blocks built into its business park. Each block draws power straight from the project's own 220 KV substation. These blocks sit on the west side of the 32.26 acre site in Devanahalli, right next to the Satellite Town Ring Road.

The blocks were part of the plan from the start. They are not a small add on tucked beside a housing launch. This guide covers what the blocks offer, why the site suits data centre firms, and what to check before you lease here.

What Are the Prestige KIADB Data Centre Blocks?


Prestige KIADB splits its full site into two zones using a central road. One zone holds close to 1,800 homes across nine towers. The other zone holds the business park, which carries three data centre blocks, one warehouse block, and one manufacturing block.

The data centre side sits apart from the residential towers. This keeps heavy equipment movement and round the clock work away from the living zone. Each block was designed around the load pattern a data centre actually needs. These facilities run non stop and cannot handle power gaps the way a normal office might.

Why Data Centre Operators Look at This Kind of Site


Data centre operators weigh a narrow set of factors when they shortlist land. Most of it comes down to power, access, and room to grow. A site that ticks all three tends to draw serious interest fast.

Building your own power setup from scratch adds real cost and real delay. Prestige KIADB was planned around exactly this kind of demand. The business park sits close to KIADB Aerospace SEZ, about 11.4 km away. Bengaluru Signature Business Park sits nearby too, roughly 12.6 km away.

This places the site inside a busy work belt, not on a lone plot. Staff, vendors, and service teams already based in this belt can reach the site fast. That matters more than it sounds once you factor in round the clock shift work.

Power Supply for the Data Centre Blocks


The biggest edge these blocks carry is the 220 KV substation on site. Data centres need power that almost never dips. Even a short cut can force servers offline and stall client work fast.

A standalone data centre site elsewhere usually has to arrange its own grid connection. That process alone can stretch on for months before construction even starts. Prestige KIADB removes that early delay, since the substation was built into the master plan from day one.

What a Standalone Data Centre Site Needs What Prestige KIADB Offers
Arrange a new grid connection Substation already built into the plan
Set up backup power separately Grid level supply as the main source
Uncertain timeline for power approval Power planned around business park demand
Isolated site away from other industry Sits inside an aerospace and business belt

Location and Access Around the Data Centre Blocks


Road access matters a lot for data centre work. Equipment deliveries, generator servicing, and shift changes all depend on a site vehicles can reach fast. The Satellite Town Ring Road sits just 2 km from Prestige KIADB, a drive of about 2 minutes. This road links the belt to other growth corridors without routing through the busy city core.

Kempegowda International Airport sits close to 20 km away, about a 29 minute drive. This suits teams flying in special gear or senior staff on short notice. A fast local road paired with a nearby airport gives data centre firms a real edge over a deeper city site.

Who Should Consider the Data Centre Blocks at Prestige KIADB


The block layout and power setup here point toward a fairly specific tenant list, not a broad mix of general office users.

  • Cloud firms growing their server capacity across North Bangalore
  • Colocation firms that host server racks for many clients
  • IT teams pulling their in house data setup into one site
  • Managed service firms running non stop client workloads
  • Telecom and network firms that need a stable regional base

Firms after a small serviced office or a walk in retail counter will not find a fit here. The block sizes and power setup were built for heavy, continuous scale.

What to Confirm Before You Lease a Data Centre Block


Prestige KIADB is still in its pre launch stage as of August 2026. RERA registration for the project remains under process. Several leasing specifics have not gone public yet, so treat any figure you hear informally as indicative only.

  • RERA status covering the business park section
  • Exact block size and floor plate on offer
  • Power load capacity assigned to each block
  • Cooling space and support area allotted per block
  • Lease tenure, renewal terms, and any lock in period
  • Fibre and network links available at the site

Confirm each point with the developer once RERA approval clears and the project reaches its official launch on 16 October 2026.

Final Word


The data centre blocks at Prestige KIADB combine strong power with a spot inside a busy work belt. Fast road access to the airport and ring road adds to the pitch. That mix suits firms that need steady, large scale space, not a converted office floor. Register interest early, since the project is still pre launch. Confirm final terms once RERA approval and the price list come through.

FAQs


1. How many data centre blocks does Prestige KIADB have?

The business park at Prestige KIADB has three data centre blocks, sitting on the west side of the 32.26 acre site in Devanahalli.

2. Do the data centre blocks have their own power supply?

Yes. A 220 KV power substation sits on site and feeds the data centre blocks straight, along with the warehouse and manufacturing blocks nearby.

3. How far is the site from Bangalore Airport?

Kempegowda International Airport is about 20 km away, close to a 29 minute drive from the project.

4. Is Prestige KIADB close to other business and technology hubs?

Yes. KIADB Aerospace SEZ sits 11.4 km away, and Bengaluru Signature Business Park sits about 12.6 km away, placing the site inside a busy work belt.

5. Who is the ideal tenant for these data centre blocks?

Cloud providers, colocation firms, enterprise IT teams, managed service providers, and telecom firms fit the block layout and power setup best.

6. When will leasing terms for the data centre blocks be finalised?

Final terms depend on RERA approval, which is under process as of August 2026. Full details should follow the official launch on 16 October 2026.